EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
bhoward
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (101)
Research
Workshop
Empennage
- (81)
-
Finished last rivets...
-
Actually riveted the...
-
More rolling on the...
-
Rolled the leading edge
-
Riveting the...
-
Record keeping
-
Set a few rivets
-
Riveted the...
-
Finished the rudder...
-
Started building...
-
Rudder trailing edge...
-
Started building the...
-
Installed stiffeners
-
Match drilled...
-
Finished stiffeners
-
Rudder stiffeners #2
-
Trim cover plate
-
Removed flange on h...
-
Installed rod end...
-
Rolled leading edge
-
Finished trim tab
-
Riveted the tab and...
-
Finished prepping...
-
Drilled the tab spar
-
Continuing trim tab
-
Completed the...
-
Riveted the left...
-
Riveted the counter...
-
Riveted the elevator...
-
Bender the elevator...
-
Preparing the trim spar
-
Deburred and dimpled...
-
Finished drilling...
-
Completed the right...
-
Riveted the skeleton...
-
Finished left...
-
E709 prep- left...
-
Left elevator prep
-
Drilling counter...
-
Working doublers and...
-
Bent trailing edge...
-
Drilled and back...
-
Finished stiffeners
-
Started elevator -...
-
Riveted vert stab...
-
Riveted the vert...
-
Clecoed the vertical...
-
Finalized drilling...
-
Drilled the vertical...
-
Continuing the...
-
Building the rudder...
-
Fitting the...
-
Fitting the...
-
Fitting the...
-
Drilling the V Stab
-
Drilling the V Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H-Stab
-
Preparing parts for...
-
Drilling the H Stab
-
Drilling the H stab
-
Drilling the H Stab
-
Drilling h stab
-
Preparing ribs
-
HS-411 assembly
-
Preparing ribs
-
Match drilling
-
HS710
-
Match Drill Doublers
-
Front Spar
-
Front Spar
-
Elevator hinge brackets
-
Prepared HS-609PP
-
Prepare HS-609PP
-
Received and...
Fuselage
Firewall
Tail Feathers
Wings
- (20)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Brian Howard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
322
Total Flight Time:
Total Expense:
$11440.00
Start/Last Date:
Oct 27, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=bhoward
Home or Last Project Picture
Jan 04, 2022
Drilled the vertical stab skin
- (2 hours)
Category: Empennage
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.